Overhaul of the kindergarten standard project 2s-04-12/67

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Standard project 2С-04-12/67

Base price with VAT
Discount price
Price $1,450.00
Discount
Price $1,450.00
Index: 03031901
Data Sheet: Working documentation including estimates
Sections: all sections
Data volume: 60 MB
File Format: *.pdf, *.xlsx
Working documentation including estimates for the overhaul of the kindergarten building, standard project 2s-04-12/67.
Technical and economic indicators:
Floors, floor: 2 (+ basement)
Building area, m2: 1261,3
Total area, m2: 2154,6
Usable area, m2: 1949,79
Construction volume, m3: 12032,3
including: below el. +0.000, m3: 3552,6
above el. +0.000, m3: 8479,7
Floor height, m: 3,3
Capacity, people: 186
Number of groups, group: 11

General instructions (architectural solutions).

For a conditional mark of 0.000, the level of the finished floor of the first floor is taken. The reconstruction project was made on the basis of measured dimensions. All design dimensions should be specified locally. Dimensions are in mm. The dimensions of newly erected structures are indicated without taking into account wall decoration. Heights are indicated from the level of the finished floor. Existing window and door openings that are not marked on the floor plans remain unchanged and are not specified in the specification. Install canopies over the entrances to the building. The visors are made of polycarbonate on a metal frame on an individual order. The placement of engineering networks should be clarified in the sections OV, VK and ES. In all rooms, cover the ventilation ducts, water and sewer risers with plasterboard sheets according to mt. frame (Knauf system). Insulate the facades with expanded polystyrene plates, at least 8 cm thick. Framing windows and doors (150 mm wide) should be made of non-combustible mineral wool insulation. Works should be carried out in accordance with the technological map for the thermal insulation device using Ceresit materials. Clean all metal elements from burrs and rust, prime and paint with enamel for 2 times. The paint must have certificates that meet the requirements of SanPiN 2.4.1.3049-13. The fencing of external stairs, balconies and porches is made to order in accordance with SP 1.13130.2009 "Fire protection systems. Escape routes and exits". To carry out the processing of used wooden structures with antiseptics and flame retardants. The visors are made to order according to the schemes presented on p. 14. The design and configuration can be changed in agreement with the customer. Sanitary partitions are made by a specialized company on an individual order from laminated chipboard. Cabin height - 1 mm.

 

Authorization