Estimate for the construction of a boiler house

Base price with VAT
Discount price
Price $12.00
Discount
Price $12.00
Index: 34.143.207
Data Sheet: Estimated documentation
Sections: all sections
Data volume: 69 MB
File Format: *.doc, *.xlsx
Expert opinion: a positive
Estimate for the construction of a gas boiler house. Object: Construction of an automated gas boiler house with fuel storage

Technical and economic characteristics of the capital construction object
Land area, m2: 201,0
Building area, m2: 44,25
Total building area, m2: 40,25
Construction volume of the building, m3: 265,6
Number of floors, floor: 1
Productivity, MW: 0,55
The length of engineering networks, including:
Heating networks, running meters: 265,0 (in a pipe)
Water supply networks, lm: 144,7
Water disposal networks, lm: 42,2
Power supply networks, lm: 60,0
Gas supply networks, lm: 102,0

Cost indicators
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 5
Construction and installation works, thousand rubles: 1
Equipment, thousand rubles: 2
Other expenses, thousand rubles: 1
including
PIR, thousand rubles: 894,67
refundable amounts, thousand rubles: 6,33
Estimated cost at the current price level of August 2013 (including VAT)
Total: thousand rubles: 27
Construction and installation works, thousand rubles: 8
Equipment, thousand rubles: 12
Other expenses, thousand rubles: 7
including
PIR, thousand rubles: 4
VAT, thousand rubles: 4
refundable amounts, thousand rubles: 36,76

Information about the standards used, as well as the applied indices for transferring the estimated cost from the base price level to the current level

The estimated cost of construction is determined by the base-index method. Local estimates are compiled in 2001 base prices. according to the collections TER-2001; TERr-2001 and TERm-2001 using the estimate and regulatory framework "State Standard 2012". The cost of materials, products, structures is accepted according to the territorial collection of estimated prices (TSSTs-2001) at current prices as of August 2013, in the absence of TSSTs-2001 in the collection, the cost is accepted according to price lists. The cost of equipment is taken according to the price lists of suppliers. The consolidated estimate calculation was compiled at the current price level as of August 2013 and at the base price level of 2001. When determining the estimated cost, overhead costs and estimated profit in local estimates are determined from the payroll in accordance with MDS81-33.2004, MDS81.25-2001 , taking into account the letter of the Ministry of Regional Development of April 13.04.2011, 9094 No. 08-IP / 27.11.2012 and clarifications on the letter of November 2536, 12 No. 81-IP / 05 / GS. Costs for temporary buildings and structures are accepted in accordance with GSN01-2001-1-2, adj. 2.4, p. 81, p.p. 05. Additional costs in the performance of work in the winter in accordance with GSN02-2001-4-11.4, table. 18 p. XNUMX. The value added tax at the current price level is XNUMX%.

Information about operational changes made to the estimate documentation in the process of checking the estimated cost

The summary estimate calculation was compiled in accordance with clause 4.74 of MDS81-35.2004. In accordance with the requirements of MDS 81-35.2004 (clauses 4.25, 4.28), the price lists are agreed upon by the Customer. Corrected local estimates, compiled in the basic price level. Local estimates have been corrected: volumes and types of work have been brought into line with the project; repeated accounting of materials, the cost of which is provided for by prices, is excluded; volumes and types of dismantling works are taken into account on the basis of the bill of quantities agreed upon by the customer; commissioning costs are accepted according to the customer's letter in accordance with MDS81-35.2004 (clause 4.102). The cost of R&D was corrected: As a result of checking the estimates for design and survey work, it was revealed that the estimates correspond to the requirements of the current price documents for determining the cost of design and survey work.