Standard design II-57-10/12-107

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Standard design II-57-10/12-107

Base price with VAT
Discount price
Price $1,000.00
Discount
Price $1,000.00
Index: 28082111
Data Sheet: Project documentation including estimates
Sections: OPP, AR, Garbage disposal, Gas supply, KR, VK, OV, TZK, ES, Estimates
Data volume: 160 MB
File Format: *.dwg, *.doc
Expert opinion: a positive
Project documentation including estimates for the overhaul of an apartment building standard project II-57-10 / 12-107
Technical and economic indicators
House Series: II-57-10/12-107
Floors, fl.: 12+poddal+herdak
Number of sections, pcs.: 0
Building area, sq.m: 2872,3
Construction volume, cubic meters: 10302
Total area of ​​the house, sq.m: 24311,9
Total living area of ​​apartments, sq.m: 5473,1
Total number of apartments, pcs.: 477
including:
one-room, pcs.: 2
two-room apartments, pcs.: 345
three-room apartments, pcs.: 20

General information.

Residential 10-section 12-storey house with a technical underground under the entire building for the placement of engineering communications and an attic. Year of construction 1971, series II-57., not an object of cultural heritage. External walls - panels, painted. Ceilings - prefabricated reinforced concrete. The roof is flat, prefabricated reinforced concrete slabs, the coating is rolled waterproofing. Loggias - at level -12 floors are made of prefabricated reinforced concrete slabs supported by walls. Total - 112. Metal fencing, asbestos-cement sheet screens. Canopies over the entrances - reinforced concrete slabs, based on the walls of the outer vestibule; Facades - painted. The plinth is plastered and painted. Windows - wooden double with paired covers and plastic, open inside. The windows of the stairwells are wooden. Partitions - gypsum concrete. Stairs - 2 marches are made of prefabricated reinforced concrete marches and platforms. Metal railings with PVC handrail. Gutter - internal, organized. Doors of entrances to entrances - deaf, metal. Basement doors are metal. Blind area - asphalted; Garbage chute - loading bucket on the stairwell; Elevators - 4 elevators with a carrying capacity of 350 kg.

Authorization