River Dredging Project

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


River Dredging Project

Base price with VAT
Discount price
Price $525.00
Discount
Price $525.00
Index: 12052100
Data Sheet: Project documentation including estimates
Sections: all sections
Data volume: 264 MB
File Format: editable formats
Design documentation including estimates and results of engineering surveys for clearing the riverbed (straightening, clearing, dredging) in order to prevent flooding of the territory.
Main technical and economic indicators of the project
Area of ​​right of way for construction, ha: 3,3/6,5
Length of the section of the canalized stream bed, m: 1300/2
Design flood probability, %: 25
Estimated maximum flow rate skip, m3/s: 149/218
Excavation volume during clearing, straightening and dredging, thousand m3: 100,4/62
Channel width after work, m: 15-18/24
Total number of employees, people: 65
Duration of construction, months: 4,5

General information.

This section of the project documentation for the project “Regulation of the river bed (straightening, clearing, dredging) to protect villages from floods” was completed in accordance with the terms of reference. The flow method is one of the progressive methods of organizing the production of construction work and is characterized by the specialization of construction departments, the concentration of mechanization and material resources, the interconnection and strict coordination of the work of all departments, the technological sequence and continuity of work. The staffing of subdivisions for the performance of certain types of construction work is carried out on the basis of the volume of work of this type, their labor intensity and the specifics of the implementation in accordance with the "Statement of Resource Requirements by Type of Construction and Installation Works". The technological sequence of the organization of construction is as follows: preparatory work; cultural and technical work; clearing, straightening and dredging of the river bed; strengthening the most problematic sections of the coast.

Authorization