Administrative building project

Base price with VAT
Discount price
Price $2,000.00
Discount
Price $2,000.00
Index: 91.131.256
Data Sheet: Project documentation without estimates and results of engineering surveys
Sections: all sections
Data volume: 1952 MB
File Format: editable formats
Expert opinion: a positive
Office building
Project documentation without estimates and the results of engineering surveys for the reconstruction with the expansion of the administrative building
Technical and economic indicators
Plot area, m2: 6758,00
Building area, m2: 3379,00
Total building area, m2: 15520,60
Construction volume, m3: 71506,02
Floors, count: 3-4-5-7

Functional purpose

12020 - placement of commercial facilities not related to the residence of the population (business centers, individual offices of various firms, companies, etc.) (*)(**). The building is the administrative office of a representative class management company. The building is designed using modern engineering technologies and materials.

Space planning solution

Designed an administrative building. The project provides for the creation of a single volume of 3-4-5-7 floors, including the existing unfinished reconstructed 3-floor. building. There are two dispersed evacuation exits from each floor. The building is 3-4-5-7 floors, complex in plan. The difference in height of the building was chosen from the conditions of the insolation map. An insolation pocket is designed in the axes Г-Ж, which allows not to disturb the lighting conditions of the neighboring buildings. One of the activities of the company is connected with the introduction of electrical developments for sea and water transport. In this regard, it was chosen to associate the external appearance of the building with a sailing ship. The reconstructed building was previously an industrial building intended for for a motor transport enterprise, partially reconstructed and adapted to current tasks, combined at the level of the 2nd and 3rd floors. The building represents one fire compartment. In the reconstructed part of the building, structural protection of metal structures by plastering is provided - 40mm. The main facade of the new building faces the embankment of the Smolenka River. In the area of ​​the first floor, a parking lot for office employees, open for 43 cars, has been designed. Drives and parking of vehicles entering the water protection zone are provided in specially equipped places with a hard surface (for the period of construction and operation) (Water Code of the Russian Federation, Art. 65). In the parking lot, from the side of the main facade, a fence (lamellas) is designed for the entire height of the floor. Driveways will connect the courtyard and the entrances to the building from all sides. The height of the driveways is 4,5m, the clear width is 6m. For vertical connections, 3 elevators are designed, with a carrying capacity of 650 kg, 1000 kg, 4 stairs of the H2 type, a metal staircase of the H3 type, a technological staircase in the reconstructed building. The entrance to the parking lot is provided from the side of the main entrance (intra-quarter passage (continuation of the street), the location of the entrance is determined (engineering and topographic plan. M 1:500, with the indicated position of the roads) of the quarter. An additional entrance is also being designed from the side of the intra-block passage near the footbridge, which will allow employees on foot to reach the public center st. metro station Primorskaya. The mark of the finished floor 0.000 (absolute mark 3,850 in the Baltic coordinate system) is taken as the mark of the first floor of the building. The project documentation ensures the accessibility of the building for people with limited mobility at the level of the first floor.

Designs

New building. The foundation is piled with grillage according to the results of geological surveys. The frame of the building is monolithic reinforced concrete, monolithic reinforced concrete floors. Roof - partially exploited, combined on reinforced concrete slabs with an organized internal drain. External walls - element-by-element sandwich panels, translucent stained-glass structures, insulation according to the calculation. Plinth finish - porcelain stoneware. Internal partitions - frame-sheathing plasterboard sheets.

Description of floors

1 floor: In the reconstructed building, in the axes A' - K' there will be technical rooms: 126 -ITP, 133-TP, 135 - MSB, 127 - ventilation chamber, 128 - water meter unit. Pom. 131 (unloading vestibule) of the former "Autoenterprise" it was decided not to dismantle, use for office maintenance, on the instructions of the customer. Pom. 125 - communication vestibule., 132,123,136 - premises for negotiations. The rest of the -offices of the department of logistics projects), the office of forwarders. 129,124 - C / C and a room for cleaning equipment. 121 - first aid station 18, (developed at the RD stage using a separate technology). It is planned to place two entrance vestibules in the new building. The main entrance is from the side of the intra-quarter passage in the continuation of Nakhimov Street. the secondary entrance is from the side of the intra-quarter passage, close to the pedestrian bridge. Each vestibule is equipped with a secretary's desk, C / A, elevator equipment. The central lobby is equipped with C/U for MMG.  At the entrance, a ramp with a slope of 8% was designed for lifting the MMG, equipped with handrails on both sides. A place has been allocated for an automated guard post - room 109. In the room 112 - security rest room. Between the axes G-M, parking of cars is designed for 43 cars / m. Estimated floor area - 1480,80 Height to false ceiling - 3m On the floor of workplaces - 20 people. 2 floor: In the reconstructed building it is planned to place an open fund of technical documentation room 228, a closed archive of those. documentation pom.231. In the room 228 designed 12 places for temporary work of employees with the archive. Pom. 229 - an office of archive workers. Pom. 216 - 218,221 offices of employees of the supply department. Pom 219 is a staff lounge. Pom.223,224 - negotiation. There are also two C / C and a room for cleaning equipment. In the new building in pom. 204-214 the department of development of multimedia systems is located. In the room 212 designed a showroom of layouts and experimental samples of multimedia equipment. On the floor there are two C / A and a universal cabin for MMG, a cabin for cleaning equipment. Killing room. inventory is equipped with a tray for collecting water. Designed two communication halls. Estimated floor area - 2698,45. Height to false ceiling - 3m. On the floor of workplaces - 56 people. 3rd floor: The reconstructed building will house: cinema-lecture hall for 38 l.m. room 330, administration offices 319-321, accounting offices332-334, 329 - staff rest room. 323 - meeting room, 324 - pom. for the plotter. On the floor there are two C / A and a universal cabin for MMG, a cabin for cleaning equipment. Killing room. inventory is equipped with a tray for collecting water. Designed two communication halls. In the new building in pom. 306-315 housed the engineering systems development department. In the room 317 designed a conference room with the possibility of audio support. On the floor there are two C / A and a universal cabin for MMG, a cabin for cleaning equipment. Killing room. inventory is equipped with a tray for collecting water. Designed two communication halls. Meeting room - room 305. Office of chief specialists - room 301. Designed two communication halls. Estimated floor area - 2643,20 Height to false ceiling - 3m On the floor of workplaces - 64 people. 4rd floor: In the new building. pom. 410, an exhibition and demonstration hall was designed, almost all objects are embodied in mock-ups and demonstration materials. In the room 401 office ch. specialists. Pom. 406 - room for copying equipment. On the floor there are two C / A and a universal cabin for MMG, a cabin for cleaning equipment. Killing room. inventory is equipped with a tray for collecting water. Designed two communication halls. Estimated floor area - 852.00. Height to false ceiling - 3m On the floor of workplaces - 39 people. 5rd floor: In the new building. In the axes W - H: pom. 509,510 design department. Pom. 508 - room for copying equipment. In the axes Г-Ж - the exploited roof. In axes 6-10 - exploited roof. In axes A - G: pom. 501, 503 commercial department. On the floor there are two C / A and a universal cabin for MMG, a cabin for cleaning equipment. Killing room. inventory is equipped with a tray for collecting water. Designed two communication halls. Estimated floor area - 1069.85 Height to false ceiling - 3m. On the floor of workplaces - 18 people. 6rd floor: In the new building. In the axes W - H: pom. 603 office of the deputy director, secretaries.